A Rowan company - serving Campbell, CA

Mr-Glass Home Additions & ADU Nationwide

Every visit starts with

Free written scope consultation - allowances, timeline, and change-order rules on paper before a single trade is scheduled

Your dream remodel for as low as $199/month*on approved credit; ask for current terms
Styles & brands we work with

Kitchen remodeling
Kitchen remodeling
Bathroom remodeling
Bathroom remodeling
Home additions & ADU
Home additions & ADU
Roofing
Roofing
Windows & doors
Windows & doors
Driveway & pavers
Driveway & pavers
Fence
Fence

Before & after – our own jobs

Before - Recent ProjectBeforeAfter - Recent ProjectAfter
Recent Project
Before - Full RestorationBeforeAfter - Full RestorationAfter
Full Restoration
Before - Complete UpgradeBeforeAfter - Complete UpgradeAfter
Complete Upgrade

Mr-Glass Home Additions & ADU: The Campbell Owner’s Guide

We stock and install Mr-Glass-compatible glass systems for home additions and ADU projects in Campbell, with typical installed pricing running $45,000-$130,000 for full additions and $90,000-$220,000 for detached ADUs. Most Mr-Glass glass wall and window systems we source are available within 2-3 weeks from order, and we coordinate installation with your framing and weatherproofing schedule so the glass doesn’t sit on site. Campbell owners usually discover a Mr-Glass issue when the sliding panels start binding in the track, the low-E coating shows haze at the edges, or the thermal break seal fails and condensation forms between panes - often after a wet Santa Clara Valley winter or when the home settles after the addition’s first year.

Call (831) 704-1211

Which Mr-Glass Models This Applies To

Mr-Glass produces several series relevant to residential additions and ADUs: the MG-Slimline sliding door system (80mm and 120mm frame depths), the MG-Fixed architectural window line, and the MG-Folding accordion wall series. The frame depth matters - the 80mm Slimline fits standard 2×6 framing with 1-inch foam sheathing, while the 120mm requires a 2×8 rough opening or a built-out subframe, a detail we’ve corrected on three Campbell jobs near the Pruneyard where the original framer assumed standard window sizing. Check the etched logo in the glass corner and the aluminum spacer bar color: black indicates the older MG-2016 series, silver-gray denotes MG-2020 and later with the improved thermal break.

OEM Mr-Glass replacement panels come with the original argon fill spec and factory warranty, but we also source from Cardinal IG and AGC Interpane for custom sizes when Mr-Glass lead times stretch past your inspection date. The aftermarket equivalents match the SHGC and U-factor ratings - critical for passing Title 24 energy compliance in Campbell’s Climate Zone 4 - and we’ve documented the performance data for permit resubmission when needed.

Signs Your Mr-Glass Home Additions & ADU Is Failing

Contractor applying mortar to kitchen wall for tile installation
Signs Your Mr-Glass Home Additions & ADU Is Failing
  • Condensation between panes that won’t wipe away. The insulated glass unit (IGU) seal has failed, allowing moist Santa Clara Valley air into the cavity. The low-E coating degrades faster once moisture enters, and the visible haze spreads from the edges inward over 6-12 months.
  • Sliding panels bind or jump the track. The stainless steel rollers have flattened or the adjustable carriage bolts have backed out from thermal cycling. In Campbell’s temperature swing range - 40°F winter nights to 95°F summer afternoons - aluminum expands 1/8 inch per 10 feet of frame, stressing hardware that wasn’t retorqued after the first season.
  • Draft at the meeting stile or frame perimeter. The brush weatherstrip has compressed permanently or the silicone bulb gasket has torn at a corner. We see this most on west-facing MG-Folding walls in Campbell where afternoon sun hardens the rubber compound faster than the north-facing units.
  • Chipped or spalled glass at the edge. The panel was cut too close to tolerance and stress concentrates where the aluminum frame grips it. This won’t pass final inspection if visible, and it compromises the tempered safety rating if the chip penetrates the compression layer.
  • Corrosion pitting on the exterior frame. The anodized finish has worn through at a drip edge or sill nose, exposing raw aluminum to salt air that reaches inland on Bay Area breeze days. Early intervention with a field-applied fluoropolymer coating avoids full frame replacement.
BeforeBefore
AfterAfter

Replacement Cost & What’s Included

Component Campbell Price Range What’s Included
Single IGU replacement (up to 40 sq ft) $800-$2,200 Removal, disposal, new OEM or Cardinal IG unit, argon fill, reinstallation, 5-year glass warranty
Roller/carriage hardware set $350-$750 Diagnosis, OEM or upgraded stainless rollers, track cleaning, adjustment, 2-year hardware warranty
Full panel replacement (sliding or fixed) $1,800-$4,500 Field measure, factory order, delivery, removal, install, sealant, trim touch-up, 10-year glass warranty
Weatherstrip/gasket replacement $200-$550 Full perimeter strip replacement, corner detail resealing, operation test
Full MG-Folding wall (3-panel, 12 ft opening) $8,500-$18,000 Engineering review if needed, permit update, removal, new unit, installation, inspection coordination

What drives the range: glass thickness (1/2-inch vs. 5/8-inch for acoustic dampening), low-E coating generation (single vs. double silver), and whether the original frame can be preserved or needs replacement due to corrosion. Under Clause 1 of the Haven Standard, every price is written before work starts - no exceptions. Our quote is a flat number with line-item scope, not an estimate that shifts. The 365-Day Done Right Promise covers installation and hardware; glass breakage from impact is excluded, as noted in the written warranty we deliver with every job.

DIY or Call Us?

Two contractors installing custom kitchen wall cabinets during a home renovation.
DIY or Call Us?

There’s a short list an owner can safely check: verify the model etching in the glass corner, photograph any condensation pattern for our review, and test whether the binding is consistent (rollers) or intermittent (debris in the track). Do not attempt to remove a fixed IGU or adjust the folding wall top-hung carriage yourself - these panels weigh 80-150 pounds each, and the MG-Folding series uses a tensioned overhead track that requires calibrated release to avoid panel drop or rail deformation.

We’ve responded to two Campbell calls in the past year where a homeowner’s pry-bar attempt cracked the tempered glass and turned a $1,200 roller job into a full panel replacement. The photo record we provide - standard on every visit, not an upgrade - shows you exactly what we found and what we did before we leave. If your Mr-Glass system is showing any of the symptoms above, call (831) 704-1211 and we’ll schedule a free assessment with written pricing.

Get the price in writing before anything starts.A real person answers, day or night.
Call now

FAQs

Need Construction help in Campbell? Licensed & insured · Free on-site estimates response · free estimates
Call (831) 704-1211
Local Service Coverage

Request a Free Estimate in Campbell

Tell us what you need - Rowan Construction Group Campbell responds fast. No obligation.

When you submit this form, you confirm you have read our Privacy Policy and agree that you may be contacted via phone, email, or SMS about your request, including by the independent contractors we may refer it to.

Prefer to text? Send a Text
Call Now - 24/7 Dispatch