Free written scope consultation - allowances, timeline, and change-order rules on paper before a single trade is scheduled
Mr-Glass Home Additions & ADU: The Campbell Owner’s Guide
We stock and install Mr-Glass-compatible glass systems for home additions and ADU projects in Campbell, with typical installed pricing running $45,000-$130,000 for full additions and $90,000-$220,000 for detached ADUs. Most Mr-Glass glass wall and window systems we source are available within 2-3 weeks from order, and we coordinate installation with your framing and weatherproofing schedule so the glass doesn’t sit on site. Campbell owners usually discover a Mr-Glass issue when the sliding panels start binding in the track, the low-E coating shows haze at the edges, or the thermal break seal fails and condensation forms between panes - often after a wet Santa Clara Valley winter or when the home settles after the addition’s first year.
Which Mr-Glass Models This Applies To
Mr-Glass produces several series relevant to residential additions and ADUs: the MG-Slimline sliding door system (80mm and 120mm frame depths), the MG-Fixed architectural window line, and the MG-Folding accordion wall series. The frame depth matters - the 80mm Slimline fits standard 2×6 framing with 1-inch foam sheathing, while the 120mm requires a 2×8 rough opening or a built-out subframe, a detail we’ve corrected on three Campbell jobs near the Pruneyard where the original framer assumed standard window sizing. Check the etched logo in the glass corner and the aluminum spacer bar color: black indicates the older MG-2016 series, silver-gray denotes MG-2020 and later with the improved thermal break.
OEM Mr-Glass replacement panels come with the original argon fill spec and factory warranty, but we also source from Cardinal IG and AGC Interpane for custom sizes when Mr-Glass lead times stretch past your inspection date. The aftermarket equivalents match the SHGC and U-factor ratings - critical for passing Title 24 energy compliance in Campbell’s Climate Zone 4 - and we’ve documented the performance data for permit resubmission when needed.
Signs Your Mr-Glass Home Additions & ADU Is Failing

- Condensation between panes that won’t wipe away. The insulated glass unit (IGU) seal has failed, allowing moist Santa Clara Valley air into the cavity. The low-E coating degrades faster once moisture enters, and the visible haze spreads from the edges inward over 6-12 months.
- Sliding panels bind or jump the track. The stainless steel rollers have flattened or the adjustable carriage bolts have backed out from thermal cycling. In Campbell’s temperature swing range - 40°F winter nights to 95°F summer afternoons - aluminum expands 1/8 inch per 10 feet of frame, stressing hardware that wasn’t retorqued after the first season.
- Draft at the meeting stile or frame perimeter. The brush weatherstrip has compressed permanently or the silicone bulb gasket has torn at a corner. We see this most on west-facing MG-Folding walls in Campbell where afternoon sun hardens the rubber compound faster than the north-facing units.
- Chipped or spalled glass at the edge. The panel was cut too close to tolerance and stress concentrates where the aluminum frame grips it. This won’t pass final inspection if visible, and it compromises the tempered safety rating if the chip penetrates the compression layer.
- Corrosion pitting on the exterior frame. The anodized finish has worn through at a drip edge or sill nose, exposing raw aluminum to salt air that reaches inland on Bay Area breeze days. Early intervention with a field-applied fluoropolymer coating avoids full frame replacement.
Before
AfterReplacement Cost & What’s Included
| Component | Campbell Price Range | What’s Included |
|---|---|---|
| Single IGU replacement (up to 40 sq ft) | $800-$2,200 | Removal, disposal, new OEM or Cardinal IG unit, argon fill, reinstallation, 5-year glass warranty |
| Roller/carriage hardware set | $350-$750 | Diagnosis, OEM or upgraded stainless rollers, track cleaning, adjustment, 2-year hardware warranty |
| Full panel replacement (sliding or fixed) | $1,800-$4,500 | Field measure, factory order, delivery, removal, install, sealant, trim touch-up, 10-year glass warranty |
| Weatherstrip/gasket replacement | $200-$550 | Full perimeter strip replacement, corner detail resealing, operation test |
| Full MG-Folding wall (3-panel, 12 ft opening) | $8,500-$18,000 | Engineering review if needed, permit update, removal, new unit, installation, inspection coordination |
What drives the range: glass thickness (1/2-inch vs. 5/8-inch for acoustic dampening), low-E coating generation (single vs. double silver), and whether the original frame can be preserved or needs replacement due to corrosion. Under Clause 1 of the Haven Standard, every price is written before work starts - no exceptions. Our quote is a flat number with line-item scope, not an estimate that shifts. The 365-Day Done Right Promise covers installation and hardware; glass breakage from impact is excluded, as noted in the written warranty we deliver with every job.
DIY or Call Us?

There’s a short list an owner can safely check: verify the model etching in the glass corner, photograph any condensation pattern for our review, and test whether the binding is consistent (rollers) or intermittent (debris in the track). Do not attempt to remove a fixed IGU or adjust the folding wall top-hung carriage yourself - these panels weigh 80-150 pounds each, and the MG-Folding series uses a tensioned overhead track that requires calibrated release to avoid panel drop or rail deformation.
We’ve responded to two Campbell calls in the past year where a homeowner’s pry-bar attempt cracked the tempered glass and turned a $1,200 roller job into a full panel replacement. The photo record we provide - standard on every visit, not an upgrade - shows you exactly what we found and what we did before we leave. If your Mr-Glass system is showing any of the symptoms above, call (831) 704-1211 and we’ll schedule a free assessment with written pricing.
FAQs
Properly sealed units last 15-20 years, though we’ve replaced MG-2016 series IGUs at 8-10 years when the original sealant formulation proved vulnerable to our temperature swings. The MG-2020 and later units use a dual-seal warm-edge spacer that performs better. Call (831) 704-1211 for an exact quote on replacement - estimates are free.
No. Once an IGU seal fails, the vacuum or argon fill cannot be restored in the field, and defogging services leave a visible residue that voids the warranty and fails inspection. We replace the full unit. Call (831) 704-1211 for an exact quote - estimates are free.
Field measurement and ordering: 1 visit, 30 minutes. Manufacturing and delivery: 2-3 weeks for standard sizes, 4-5 weeks for custom. Installation day: 2-4 hours for a single panel, 1-2 days for a full MG-Folding wall with trim and sealant cure time. Call (831) 704-1211 to schedule measurement - estimates are free.
We stock common roller sets, weatherstrip profiles, and sealant cartridges for MG-Slimline and MG-Fixed series. Full glass panels are ordered to measured size - every opening varies, and ordering speculative stock would mean charging for storage we’d rather not pass along. Call (831) 704-1211 to confirm availability for your specific model - estimates are free.
Rowan Construction Group Campbell is an independent service provider and is not affiliated with Mr-Glass. We also stock and install parts for KraftMaid, Cambria, and Silestone systems.
Measure twice, document once, build it right. That’s the standard Grant Rowan set when he founded Rowan Construction Group in 2007, and it’s why every one of our 4,000-plus projects has finished within a few percent of the written price the customer agreed to.
Ready to get your Mr-Glass system assessed? Call (831) 704-1211 to schedule your free estimate. We’ll deliver a written, line-item quote before any work starts - that’s Clause 1 of the Haven Standard, and it’s non-negotiable.
Written by Grant Rowan, Owner, Rowan Construction Group Campbell at Rowan Construction Group Campbell, serving Campbell and nearby areas.







Before
After
Before
After
Before
After